1. Home
  2. Projects

Our work

Projects and gallery

Communities we have built, a gallery of Duca homes inside and out, and selected partner projects.

Frame to finish

From frame to finish

Every Duca home goes through the same careful stages, and we photograph them. Drag each slider to see the same house, from the same spot, during the build and on the day it was done.

198 Fortissimo Drive in Hamilton with stone up and sheathing showing, October 2020 198 Fortissimo Drive finished, with its exterior lights on, 2021
198 Fortissimo Drive, Hamilton. Stone up and sheathing still showing in October 2020. Finished, lit and ready for its family in 2021.
29 Velvet Court in Stoney Creek framed, July 2023 29 Velvet Court finished in stucco and stone with a black front door, October 2023
29 Velvet Court, Stoney Creek. Framed in July 2023. Stucco, stone and a black front door by October. A 2,648 square foot two storey family home.
486 Anson Drive in Ancaster under scaffolding with stucco going on, May 2017 486 Anson Drive finished, with the lawn in and lights on, October 2017
486 Anson Drive, Ancaster. Scaffolding and stucco in May 2017. By October, a finished custom two storey on a treed lot, lawn in and lights on.
The great room at 486 Anson Drive with raw trim, bare floors and stacked lumber The finished great room at 486 Anson Drive with a painted coffered ceiling, panelled fireplace wall and built in cabinets
486 Anson Drive, great room. Raw trim, bare floors and stacked lumber. Six weeks later: a painted coffered ceiling, panelled fireplace wall and built in cabinets.
A 2018 Duca custom home dining room with painter's tape on every panel, January The same dining room finished in deep navy with white moulding and a lit tray ceiling, April
2018 custom home, dining room. Painter's tape on every panel in January. By April, deep navy walls, crisp white moulding and a glowing tray ceiling.
A 2018 Duca family room with a ladder under the taped coffered ceiling, January The finished family room with its coffered ceiling and stone fireplace wall, April
2018 custom home, family room. A ladder under a taped coffered ceiling. Three months on, a stone fireplace wall and a room the family actually lives in.

A custom garage addition, start to finish. From the first trench to framing, roof and the final stone, this garage went up with a spacious multi purpose loft above it. Need more room without moving? Let's talk about your project.

Book a free consult

Talk to Frank

From frame to finish, starting with a conversation

You've seen how our homes go up. Yours starts with a free consultation with Frank.

Book a free consult with Frank

A few details and Frank will get back to you personally.

Free and no obligation. Frank replies himself, not a call centre.

By sending this you agree Duca Homes may reply by phone, text or email about your project, including a few short follow up emails you can stop at any time. We never sell your details. Privacy